在加工金屬、石材等硬質材料的時候,我們經(jīng)常會看到數(shù)控雕刻機加工過程中會不定時的加水,這是為什么呢?今天小編就給大家分析一下。
When processing metal, stone and other hard materials, we often see that water will be added from time to time during the processing of NC engraving machine. Why? Today, Xiaobian will analyze it for you.
石材雕刻機在工作過程中需要連接電源,電源在機器上進行流通的時候,必然會產生熱量。主軸在長時間通電工作的情況下,可能會溫度過高,進而我們需要用水對其進行一定的冷卻。
The stone carving machine needs to be connected to the power supply in the working process. When the power supply circulates on the machine, it will inevitably produce heat. When the spindle is powered on for a long time, the temperature may be too high, so we need to cool it with water.
在另一個方面就是,相對于石材雕刻機要雕刻的石材來說的,如果石材過硬的話,刀頭在長期雕刻之后,同樣會過熱,所以刀頭也需要水冷。
On the other hand, compared with the stone to be carved by the stone carving machine, if the stone is excellent, the cutter head will also overheat after long-term carving, so the cutter head also needs water cooling.
石材雕刻機和墓碑雕刻機都需要這也的雙冷卻,因為如果沒有用水進行一定的冷卻,讓機器通電干燒,會對機器本身造成嚴重的損害。
Both stone carving machine and tombstone carving machine need this kind of double cooling, because if there is no water for certain cooling and the machine is powered on for dry burning, it will cause serious damage to the machine itself.
那么在石材雕刻機工作的過程中,容易出問題的就是主軸,主軸干燒會導致主軸發(fā)熱過度,一旦發(fā)熱過度就有可能將主軸燒掉。主軸一旦燒掉,就要把其返廠維修。那么這個周期一般是一到兩個周左右。一到兩個周的時間進行維修,肯定會延誤客戶訂單。
In the process of stone carving machine working, the main shaft is prone to problems. Dry burning of the main shaft will lead to excessive heating of the main shaft. Once the heating is excessive, it is possible to burn the main shaft. Once the spindle is burned, it should be returned to the factory for maintenance. So this cycle is usually about one to two weeks. One to two weeks of repair will certainly delay the customer's order.
綜上所述,在操作機器進行加工工作的時候,一定要合理的進行操作機器,保證機器的正常使用的基礎上,提高生產效率,延長機器的使用壽命
To sum up, when operating the machine for processing, we must operate the machine reasonably to improve the production efficiency and prolong the service life of the machine on the basis of ensuring the normal use of the machine
石材雕刻機進行亂刻的一個方面,也可能是石材雕刻機主軸過熱導致的。如果不對主軸進行通水冷卻,那么主軸就會出現(xiàn)抖動或者錯位,一會兒快,一會兒慢,并且有些不穩(wěn)定。
One aspect of the random engraving of the stone engraving machine may also be caused by the overheating of the main shaft of the stone engraving machine. If the main shaft is not cooled by water, the main shaft will shake or dislocation, which will be fast and slow for a while, and some instability.
本文由石材雕刻機為您提供,我們的網(wǎng)站是:/我們將以全心全意的熱情為您提供服務,歡迎您的訪問
This article is provided by stone carving machine. Our website is: / We will provide you with services with wholehearted enthusiasm. Welcome to visit
上一篇:木工雕刻機快速雕刻有訣竅
全年征稿/資訊合作
聯(lián)系郵箱:1271141964@qq.com
免責聲明
- 凡本網(wǎng)注明"來源:智能制造網(wǎng)"的所有作品,版權均屬于智能制造網(wǎng),轉載請必須注明智能制造網(wǎng),http://towegas.com。違反者本網(wǎng)將追究相關法律責任。
- 企業(yè)發(fā)布的公司新聞、技術文章、資料下載等內容,如涉及侵權、違規(guī)遭投訴的,一律由發(fā)布企業(yè)自行承擔責任,本網(wǎng)有權刪除內容并追溯責任。
- 本網(wǎng)轉載并注明自其它來源的作品,目的在于傳遞更多信息,并不代表本網(wǎng)贊同其觀點或證實其內容的真實性,不承擔此類作品侵權行為的直接責任及連帶責任。其他媒體、網(wǎng)站或個人從本網(wǎng)轉載時,必須保留本網(wǎng)注明的作品來源,并自負版權等法律責任。
- 如涉及作品內容、版權等問題,請在作品發(fā)表之日起一周內與本網(wǎng)聯(lián)系,否則視為放棄相關權利。
SAMPE中國第二十屆國際先進復合材料展覽會
展會城市:北京市展會時間:2025-06-18