上海德旖工業(yè)自動(dòng)化設(shè)備有限公司
參考價(jià): | 面議 |
- 產(chǎn)品型號(hào)
- 品牌
- 經(jīng)銷(xiāo)商 廠商性質(zhì)
- 所在地
訪(fǎng)問(wèn)次數(shù):430更新時(shí)間:2022-03-17 08:05:13
DCM1 Series | DCM2 Series |
Model | DCM 1/2∴20 | DCM 1/2∴25 | DCM 1∴30 | DCM 2∴32 | DCM 1/2∴40 |
Bore | ?20mm | ?25mm | ?30mm | ?32mm | ?40mm |
Action | Double Acting, Single Acting (Option) | ||||
Min-Max Press | 0.05MPa{0.5Цf/Р}-0.99MPa{9.9Цf/Р} | ||||
Proof Press | 1.5MPa{15Цf/Р} | ||||
Amb. Temp | -10~+70∩ | ||||
Piston Speed | 50-750mm/s | ||||
Cushion | Both Side Rubber (STD), Air( Option) | ||||
Stroke Tolerance (mm) | +1.4-0 | ||||
∝Lubrication | Non-Lube | ||||
Port Size | 1/8 | 1/8 | 1/8 | 1/8 | 1/4 |
STD Stroke | 25,50,75,100,125,150,200,250,300 | ||||
Auto Switch | Mounting Band (D-C73K) | ||||
Mounting Bracket(∴) | B : Basic, L : Foot, F : Rod Side FLANGE, G : Head Side Flange, C : Single Cleris, D : Double Clevis, T : ROD Side Trunnion ,U : Head Side Trunnion, E : Boss-cut |